Shenyang South Railway Station was built in March 2010 and put into use on September 1, 2015. The total construction area of the station is 254,200 square meters, and the waiting hall is 31,000 square meters, which can accommodate 10,000 passengers at the same time. The station has 26 arrival and de
Tianjin West Railway Station is one of the five starting stations of the Beijing-Shanghai high-speed Railway and the largest railway station in Tianjin.Tianjin West Railway Station covers an area of about 680,000 square meters, the main structure of the station building is two floors above ground an
The total construction area of Beijing South Railway Station is 24,500 square meters, the total length of the station is 147 meters and 120 meters, and the platform type is 18.491 meters and 21.3 meters wide island platform. The transfer hall on the ground floor of Beijing South Railway Station is t
Chengdu East Railway Station has a total floor area of 220,000 square meters, including 107,000 square meters of passenger accommodation, covering an area of 867,000 square meters.The new Chengdu East Railway Station was built on the site of the old Shahebao railway station, Construction officially
Guangzhou South Railway Station began construction in December 2004 and was put into use on January 30, 2010. As of 2019, the total construction area of Guangzhou South Railway Station is 615,000 square meters, the total station building area is 486,000 square meters, the total investment is 13 bill
The total construction area of Jinan West Railway Station is 100,000 square meters [8], and the main station building area is 62,534 square meters.The design of Jinan West Railway Station reflects the regional and cultural characteristics of Shandong. The whole station building has the style of trad
Nanjing South Railway Station covers an area of about 700,000 square meters, with a total construction area of 730,000 square meters and a total construction area of 458,000 square meters, of which the main station building area is 387,000 square meters.The planning and design scheme was finalized i
On July 25, 2012, the construction of Nanning East Railway Station began, and on December 26, 2014, Nanning East Railway Station was put into operation. The total construction area of Nanning East Railway Station is 267,471 square meters, including 12,000 square meters of station building, 120,000 s
Shenzhen North Railway Station covers an area of 2.4 million square meters is the core station of Shenzhen railway's "four main and four auxiliary" passenger transport pattern.Shenzhen North Railway Station is the largest comprehensive railway hub in Shenzhen, with the most complete connection funct